Concretum - the fastest concrete
Concretum offers a rapid-hardening concrete that reaches full strength just one hour after pouring. Our rapid-hardening concrete has been in use successfully since 2004 to reconstruct airport pavements and motorways without disrupting traffic. Up to 1,000 m2 of concrete pavement can be replaced in a six-hour overnight stage. The use of Concretum rapid-hardening concrete is therefore the most economic and sustainable way to maintain the quality of our transport infrastructure over the long term.
References
- Reference
Runway reconstruction Sabiha Gökçen Airport (SAW), 2018Patrick Staehli2019-07-02T13:52:30+01:00 - Reference
Taxiway repair at Brussels-Zaventem Airport (BRU), 2019 (1050) Patrick Staehli2019-08-16T09:31:09+01:00 - Reference
Airfield repair at Václav Havel Airport Prague (PRG), 2017 (1013)Patrick Staehli2019-08-15T14:03:11+01:00 - Reference
Repair of stands at Charles de Gaulle (CDG), 2017 (1001)Patrick Staehli2019-06-14T09:53:31+01:00 - Reference
Repair at India aircraft stand areas ZRH 2015, Zurich Airport (896)Patrick Staehli2019-06-14T09:53:32+01:00 - Reference
Repair of concrete surfaces at Frankfurt Airport, Frankfurt am Main, 2014 (772)Patrick Staehli2019-06-14T09:53:32+01:00 - Reference
World Premier: Rapid-hardening concrete with a paver on the A2 at Feldkirchen 2015, Graz/AT (632)Patrick Staehli2019-06-14T09:53:32+01:00 - Reference
Repair of taxiways with a slipform paver 2015, Vienna Airport (632)Patrick Staehli2019-06-14T09:53:32+01:00
News
Concretum Q-REP G repairs at Keflavik airport, Island
Concretum Q-REP G repairs at Keflavik airport and presenting at the Steinsteypudagurinn 2020 (Concrete-Day) in [...]
Press release: ASTM certification for Concretum’s rapid-hardening cement
Concretum Q-FLASH cem 100 (P) has been certified according to the ASTM standard C1157 for [...]
Concretum in Chicago, IL
Concretum at the International Airfield & Highway Pavements Conference in Chicago. The main topics discussed [...]