New Building of a Track Foundation Plate, Railway Station Olten/SO


Spacer over Text Main

Construction of a track foundation plate with rapid-hardening concrete Concretum® Q-FLASH 2/20



Referenz_SBB_Olten_Einbau


Spacer over Text Main

Concrete placement...






Referenz_Olten_Betrieb


Spacer over Text Main

...during normal operation




Spacer over Text Main

Initial Status



Spacer over Text Main

Railway station Olten is one of the most important through stations of Switzerland. In the area of the railway station Olten the route is curved which leads to a high transverse loading of the track foundations. Therefore it was necessary to construct a new track foundation plate (9.10 x 2.40 m) above the subway. The train transportation service should be kept as undisturbed as possible during the repair works. The drying period of the concrete and thus the waiting period until the sealant could be applied determined the cut-off time of the track concerned.



Spacer over Text Main

Solution and evaluation



Spacer over Text Main

To keep the cut-off times as short as possible, the concrete used to renew the track foundation plate had to harden and dry as quickly as possible. Therefore, Concretum® Q-FLASH 2/20 was selected. The fresh concrete was well workable for about 75 minutes and could be placed without any problems during this period of time. Only 3.5 hours after the placement, the compression strength was already above 20 N/mm2 and the moisture content below 4.0 CM-%. Consequently, the working process could be continued and the sealing system type OS 11 could be applied.

Using Concretum® Q-FLASH 2/20, the construction time could be reduced to an absolute minimum. This system, which has so far mainly been used for the repair of landing fields, has optimally proved of value for other time-relevant concrete applications.




Icon Download
Spacer between icon and text
Spacer over Text Main
Film SBB, Olten with Q-FLASH 2/20 (SWF, 11643 kb)







Facts





Spacer over text Side

Product:
Q-FLASH 2/20




Spacer over text Side

Project duration:
September 2008




Spacer over text Side

Authority:
SBB




Spacer over text Side

Engineer:
A. Aegerter & Dr. O. Bosshardt AG, Ingenieure und Planer




Spacer over text Side

Building contractor:
Vanoli AG Zofingen




Spacer over text Side

Concrete supplier:
Baustoffzentrum Olten/Zofingen BOZ










Icon Print
Spacer between icon and text
Spacer over text Side
Show print version

Icon Generate PDF
Spacer between icon and text
Spacer over Text Main
Generate PDF
Spacer over text Side
Top
Spacer between icon and text
Icon Top



Webdesign by Screenlight
Spacer between icon and text

-

Spacer between icon and text
Content Management by CMS Toolpark pc3