Repair of Walchebrücke, Zurich


Referenz Engineering Walchebrücke 01

Spacer over Text Main

Problem and task



Spacer over Text Main

During the repair of the Walchebrücke in 2006 a mix of different material compositions was found in the existing bridge deck. Project and site management as well as the contractor decided to submit these compositions to a careful examination. As a result of this examination more information on conservation or demolition of these compositions was expected. Another task was the selection of new and appropriate materials for repair.



Spacer over Text Main

Solution



Spacer over Text Main

The examined materials had their origin in the original construction and in two earlier repairs. Structural concrete as well as a high-strength polymeric mortar and a comparatively low strength cement mortar were found. Layer thickness and distribution of these materials showed extreme variations. For an appropriate sizing of the planned bridge sealing, the moisture diffusion resistance of the different materials was determined. In addition, stiffness and adhesive strength between these materials were examined too. The planned new layer of concrete had to allow extreme variation of layer thickness and had to bridge existing cracks in the base layer. Especially for this purpose a shrinkage compensated concrete was designed. This concrete was reinforced by high modulus polymer fibres, which caused an advanced ductility. To apply sealing and roofing bitumen fast and of good quality the drying process of this fibre concrete was monitored.



Spacer over Text Main

Judgement



Spacer over Text Main

Thanks to the analysis of the existing composition and to the estimation of its associated deformation behaviour the repair could be achieved very efficiently. On the one hand, a bigger part of the existing composition could be saved and on the other hand, the application of the fibre concrete lead to a repair that was cheaper in comparison to an application of premixed repair mortars. Like this, the durability of the Walchebrücke can be guaranteed efficiently for the next decades.








Facts





Spacer over text Side

Duration of the project:
April 2006 to December 2006 (consulting period of Concretum)




Spacer over text Side

Building owner:
Tiefbauamt der Stadt Zürich




Spacer over text Side

Engineers:
Gruner AG Ingenieure und Planer,

ACS Partner AG




Spacer over text Side

Contractor:
ARGE StraBAG / Züblin Strabag (now: Züblin Murer)




Spacer over text Side

Client:
Building owner



Referenz Engineering Walchebrücke 04

Referenz Engineering Walchebrücke 02

Referenz Engineering Walchebrücke 03








Icon Print
Spacer between icon and text
Spacer over text Side
Show print version

Icon Generate PDF
Spacer between icon and text
Spacer over Text Main
Generate PDF
Spacer over text Side
Top
Spacer between icon and text
Icon Top



Webdesign by Screenlight
Spacer between icon and text

-

Spacer between icon and text
Content Management by CMS Toolpark pc3