Reference Engineering

Dubai Metro


Spacer over Text Main

Optimizing of the concrete mixture and the concreting processes


Referenz Engineering Dubai Stützen

Spacer over Text Main

Problem and task



Spacer over Text Main

Up to 2.0 million cubic meters of concrete with the highest requirements to durability and early strength are used for the construction of Dubai Metro. Unexpected fluctuations of the surrounding temperature and supply gaps in the distribution of selected raw material (e.g. microsilica) lead to a sinking compressive strength and other losses of quality characteristics. For the construction of massive supporting members with diameters of up to 2.4 m it was necessary to estimate the risk of thermically induced cracking. The definition of the time of concreting, construction process and curing was crucial to avoid durability problems.



Spacer over Text Main

Solution



Spacer over Text Main

During an in-situ analysis of the concrete production processes, formulations and base material by our consultants, there were found three measures which lead to a strong improvement in quality.


Icon Bullet
Spacer between icon and text
Spacer over Text Main

Selection of suitable additives.

Spacer over Text Main
Icon Bullet
Spacer between icon and text
Spacer over Text Main

Reduction of the content of the used types of microsilica with strongly fluctuating quality.

Spacer over Text Main
Icon Bullet
Spacer between icon and text
Spacer over Text Main

Establishment of a reliable controlling plan with check and measure lists to remove the problems fast and goal-directedly.

Spacer over Text Main

Spacer over Text Main

Due to a tight schedule it was not possible to make tests in advance reffering to the risk of cracking in massive supporting members. For this reason, numerical computer simulations based on known concrete properties were made which could realistically predict the development of tempetature and cracking. A final parameter study lead to the definition of the optimal concreting moment and curing. Using this information, it was possible to avoid the development of cracking despite the massive construction method.



Spacer over Text Main

Description



Spacer over Text Main

With the measures taken the quality of the concreting work could be re-established and - for the quick local realization - a delay of the project avoided. Our consultants' great experience and the use of modern equipment (computer simulations) made it possible.








Facts





Spacer over text Side

Duration of the project:
October 2006 to January 2007




Spacer over text Side

Building owner:
United Arab Emirates – Emirate Dubai.




Spacer over text Side

Client:
Japan-Turkey Metro Joint Venture (JTMJV).










Icon Print
Spacer between icon and text
Spacer over text Side
Show print version

Icon Generate PDF
Spacer between icon and text
Spacer over Text Main
Generate PDF
Spacer over text Side
Top
Spacer between icon and text
Icon Top



Webdesign by Screenlight
Spacer between icon and text

-

Spacer between icon and text
Content Management by CMS Toolpark pc3