Long-term Observation of a Daywork Tunnel


Referenz Engineering Sonden Lüsslingen

Spacer over Text Main

Problem and task



Spacer over Text Main

Between 1993 and 2002, among other things the roofing Lüsslingen was errected in daywork during the new building of the highway N5 between Solothurn and Biel. As independent surface protection measure and integral component of the protective concept, in-depth impregnation was applied serving as a chloride barrier (used for the first time in Switzerland). This way, capillar liquid absorption could be efficiently avoided. Chloride sensors were installed at suitable and representative positions as to observe the efficiency of this measure during the occupancy period. These sensors have to indicate the penetration of chloride early to allow the taking of measures in time (before reinforcement corrosion starts). Furthermore, the regular measurements should not disturb the traffic.



Spacer over Text Main

Solution



Spacer over Text Main

Totally 27 chloride sensors were installed in various distances to the portal and in various cross-section positions. The cables lead to a central connecting box in the service canal which is located between the two tunnels. The manual measurement of the corrosion potentials, corrosion flow, temperature and resistances as the function of distance from the construction unit surface takes place regularly. The equipment is also prepared for continuous measurements with automatical datalogging systems.



Spacer over Text Main

Judgement



Spacer over Text Main

This installed observation system allows us to detect the penetration of chloride early and with little effort. It is possible to continuously estimate the risk of reinforcement corrosion. The use of this observation system made an important contribution to a long repair-free occupancy period of these constructions.








Facts





Spacer over text Side

Duration of the project:
Since 2001




Spacer over text Side

Building owner and client:
Civil Engineering Office Kanton Solothurn










Icon Print
Spacer between icon and text
Spacer over text Side
Show print version

Icon Generate PDF
Spacer between icon and text
Spacer over Text Main
Generate PDF
Spacer over text Side
Top
Spacer between icon and text
Icon Top



Webdesign by Screenlight
Spacer between icon and text

-

Spacer between icon and text
Content Management by CMS Toolpark pc3