
|

|



|

|

Repair of Ganterbrücke Simplonstrasse A9, Glis/VS

Duration of the project: Since March 2007. Owner and client: Canton Wallis, Department for transportation, construction and environment.

|

|

|

|



|

|

Dubai Metro

Duration of the project: October 2006 to January 2007. Owner: United Arab Emirates – Emirate Dubai. Client: Japan-Turkey Metro Joint Venture (JTMJV). Project: Optimization of concrete mix design.

|

|

|

|



|

|

Repair of Walchebrücke, Zurich

Duration of the project: April 2006 to December 2006. Building owner: Tiefbauamt der Stadt Zürich. Engineers: Gruner AG Ingenieure und Planer, ACS Partner AG. Contractor: ARGE StraBAG/Züblin Strabag (now: Züblin Murer).

|

|

|

|



|

|

Cut and cover tunnel, Lüsslingen/SO

Object: Highway sector A5 Yverdon-Lutterbach, cut and cover Lüsslingen and Spitalhof, Tunnel Birchi, tunnel model Lüsslingen. Duration of the project: September 2001 to August 2003. Owner and client: Canton Solothurn, Department for Civil Engineering.

|

|

|

|



|

|

Long term surveillance of a cut and cover tunnel

Duration of the project: Since 2001. Owner and client: Canton Solothurn, Department for Civil Engineering.

|

|

|

|



|

|

Cut and cover tunnel, Altstetten-Süd/ZH

Duration of the project: January to July 2002. Owner: Swiss Federal Railway (SBB). Client: Locher AG, Zurich.

|

|

|

|



|

|

High ductility repair mortar

Duration of the project: March to October 2000. Client: Construction material manufacturer.

|

|

|