In order to make the RhB bridge at Bever more earthquake-proof, the foundation was enlarged. The 20 m3 of rapid-hardening concrete was poured in one overnight stage. The temperature chart clearly shows how small the temperature development of the rapid-hardening concrete Concretum® Q-FLASH 2/20 is.

Sprecher_20150928_ID8535_Ausschnitt

Bever_grafik_EN

Temperaturverlauf_EN